How Not To Manage a Project /Technology and Operations Management

Table of contents

Rapid advancements in telecommunication technology have led to increased projects in the area of information systems as businesses seek to embrace latest technologies (Irani et al 2002, pp. 199-211). Today, many organizations are spending a lot of resources in projects pertaining to new technology as way of attaining competitive advantages. Therefore, if such projects fail, it would imply that the organizations would incur serious losses. It is in line with these potential sources of failure of projects that we examine the various issues which Gary Allison faced as the program manager of The Orion Shield Project.

The Technical Issues That Faced Program Manager Gary Allison

One of the issues which faced Gary Allison was technical issues. The program manager did not have any difficulty in obtaining functional support required in coming up with a technical proposal although the manager noted a technical problem (The Orion Shield Project, 2003, p. 1). The manager discovered that the specifications had indicated that the entire components had to function in a normal and in a successful manner within temperatures varying from -65° F to 145° F.

Yet, according to the prevailing tests, it was not possible for the design by the Scientific Engineering Corporation to operate in temperatures above 130° F (The Orion Shield Project, 2003, p. 1). Even after an extensive R& D process, Gary still strongly believed that it was not possible to meet the original specifications without changing the materials which presented a technical challenge.

The other technical issue which faced Gary was to develop raw materials which would finally be accepted by the client (The Orion Shield Project, 2003, p. 6). Similarly, the production manager was faced with the technicality of preparing and test running the raw materials as to provide evidence that no variations would exists between the lab and large-scale productions.

Ethical Issues That Faced Program Manager Gary Allison

The first ethical issue which faced Gary concerned the acceptance to play the role of spearheading the project. The ethical concern in this case was Gary’s awareness that it would not be possible to achieve the project specifications based on the initial design specifications (The Orion Shield Project, 2003, p. 1). In spite of this knowledge, the opportunity which had arisen of being promoted to a higher position so interested Gary to the point to accepting to take up the role of a program manager.

The other ethical issue arises from the verification plan which had been intended to assure the clients that no alterations had been made to the production materials from the research and development laboratories to the manufacturing factories (The Orion Shield Project, 2003, p. 8). Gary acted unethically by claiming that wrong raw materials which had been used had resulted from the fact that employees worked overtime yet the mistake had resulted from changing the original materials.

 Legal Issues That Faced Program Manager Gary Allison

One legal concern which faced Gary was the fact that it would not be possible to achieve the expected results from the test matrix which the technical proposal contained (The Orion Shield Project, 2003, p. 6). It is in this regard that Gary sought to establish the raw material which could comply with the specifications by developing a new strategy in conjunction with the chief engineer in charge of the project.

The fact that Gary lied that discrepancies in material usage resulted from overworking employees yet the materials had earlier been changed also represents a legal issue (The Orion Shield Project, 2003, p. 8). The rationale in this case is that clients can sue Gary for dishonesty. Contrary to the claim that working staff past the usual time was the reason for the mistake, the test results clearly demonstrated that wrong raw materials had been used in the production test runs.

Contractual Issues That Faced Program Manager Gary Allison

The first contractual issue which faced Gary as the program manager was staffing (The Orion Shield Project, 2003, p. 5). This was because Gary had been tasked with the job of biding the program but which did not incorporate the element of staffing. For the SEC to succeed, it had to depend on production operations (The Orion Shield Project, 2003, p. 5). Guided by this rationale, it was quite unfortunate for Gary to learn that the engineering executives were not willing to release their key personnel to the Orion Shield venture.

Other Project Management Issues That Faced Program Manager Gary AllisonResearch has shown that about 31% of projects in the area of ICT are cancelled before they can be accomplished (Henderson & Beaumont, 2003, p. 2). Studies also show that another 53% of the ICT projects exceed the original budgets which had been allocated for them (Henderson & Beaumont, 2003, p. 2). Similarly, more that 70% of the ICT projects fail because the project managers are unable to accomplish the projects within the expected time, within the budget constraints as well as the expected quality (Henderson & Beaumont, 2003, p. 2).

In this case, the manufacturing activities could not be accomplished within the budgeted time. The manufacturing activities delayed for the simple reason that Gary had decided to personally develop the bill for the materials rather than delegating the task as way of cost reduction (The Orion Shield Project, 2003, p. 8). Similarly, Gary had to work within the budget constraint and could not afford to employ more employees since this would have additional cost implications.

The Instances Where Gary Did and Did Not Do Well

The first instance where Gary did well was to inform Larsen that it would not be possible to meet the original design specifications. Gary’s decision was based on the fact that even after a thorough research and development process, Gary was convinced that it would not be feasible to operate the original design material at temperatures beyond 130° F (The Orion Shield Project, 2003, p. 1). It means that to the best of Gary’s knowledge and being honest with the boss, Gary was right to inform Larsen of the real situation on the ground.

The other instance where Gary did well was trying to arrange a meeting with Henry Larsen even though Larsen was always unavailable (The Orion Shield Project, 2003, p. 6). Gary was also clearly committed to the success of the project and literally overworked himself to ensure that the project succeeded. However, Garry should be criticized for delegating all the administrative duties to the office staff.

Although it can be argued that delegation is a good gesture in empowering and motivating staff performance, Gary made a mistake by delegating entirely everything (The Orion Shield Project, 2003, p. 6). As the overall project manager, Garry still needed to exercise some level of control in the administrative duties.  The other area where Gary did not do well was in the area of minutes. It was wrong for Gary to concentrate on presenting all the data without making considerations into the issue of minutes which the clients were justified to request for (The Orion Shield Project, 2003, p. 6).

Conclusion

It is important to note that there are various reasons why a project can fail, the most common being lack of proper planning and unclear responsibilities (Schwalbe, 2000). Gary most probably made a mistake by being so much engrossed in administrative work to an extent of forgetting to visit the research laboratories (The Orion Shield Project, 2003, p. 7). The other wrongdoing for Gary can be seen in the way the project manager attempts to cover up the unexpected results during the verification of production materials.

References

  1. Henderson, S., & Beaumont, N. (2003). Literature Review – Managing Information and Communication Technology Project Risk. Working Paper Series 43/03 pp.1- 7.
  2. Irani, Z., Sharaif, A., Love, P. E., Kahraman, C. (2002). Applying Concepts of
  3. Fuzzy Cognitive Mapping to Models: The IT/IS Investment Evaluation Process, International Journal of Production Economics, vol. 75, pp. 199-211.
  4. Schwalbe, K. (2000). Information Technology Project Management. Cambridge, USA.
  5. The Orion Shield Project. (2003) The Orion Shield Project – Project Proposal p. 1. Retrieved June 3, 2009 from http://polaris.umuc.edu/cvu/orion/home.html

Calculate the price
Make an order in advance and get the best price
Pages (550 words)
$0.00
*Price with a welcome 15% discount applied.
Pro tip: If you want to save more money and pay the lowest price, you need to set a more extended deadline.
We know how difficult it is to be a student these days. That's why our prices are one of the most affordable on the market, and there are no hidden fees.

Instead, we offer bonuses, discounts, and free services to make your experience outstanding.
How it works
Receive a 100% original paper that will pass Turnitin from a top essay writing service
step 1
Upload your instructions
Fill out the order form and provide paper details. You can even attach screenshots or add additional instructions later. If something is not clear or missing, the writer will contact you for clarification.
Pro service tips
How to get the most out of your experience with MyhomeworkGeeks
One writer throughout the entire course
If you like the writer, you can hire them again. Just copy & paste their ID on the order form ("Preferred Writer's ID" field). This way, your vocabulary will be uniform, and the writer will be aware of your needs.
The same paper from different writers
You can order essay or any other work from two different writers to choose the best one or give another version to a friend. This can be done through the add-on "Same paper from another writer."
Copy of sources used by the writer
Our college essay writers work with ScienceDirect and other databases. They can send you articles or materials used in PDF or through screenshots. Just tick the "Copy of sources" field on the order form.
Testimonials
See why 20k+ students have chosen us as their sole writing assistance provider
Check out the latest reviews and opinions submitted by real customers worldwide and make an informed decision.
Sociology
THANK YOUUUUU
Customer 452591, March 18th, 2021
Nursing
thank you so much
Customer 452749, June 10th, 2021
business
Great job
Customer 452773, February 13th, 2023
Criminal Justice
This has been the greatest help while I am recovering from an illness. Thank your team so much.
Customer 452671, May 2nd, 2021
Business and administrative studies
excellent job! got an A, thank you
Customer 452773, May 24th, 2023
Business and administrative studies
great job as always
Customer 452773, February 26th, 2023
business
Thank you for your hard work and help.
Customer 452773, February 13th, 2023
Business and administrative studies
excellent job thank you Your Score 166.25/ 175- A 1. Current Culture 15% of total grade 18.37 Criterion "1. Current Culture" has textual feedback Criterion Feedback I see interesting points, though, in general they are not about the culture.
Customer 452773, June 4th, 2023
Management
Love this writer!!! Great work
Customer 452597, April 5th, 2021
Social Work and Human Services
Although it took 2 revisions I am satisfied but I did receive it late because of that.
Customer 452603, March 25th, 2021
DATA565
The support team was late responding , my paper was late because the support team didn't respond in a timely manner. The writer of the paper finally got it right but seems there was a problem getting the revisioin to me.
Customer 452773, April 7th, 2024
Business and administrative studies
excellent job
Customer 452773, March 12th, 2023
11,595
Customer reviews in total
96%
Current satisfaction rate
3 pages
Average paper length
37%
Customers referred by a friend
OUR GIFT TO YOU
15% OFF your first order
Use a coupon FIRST15 and enjoy expert help with any task at the most affordable price.
Claim my 15% OFF Order in Chat
Close

Sometimes it is hard to do all the work on your own

Let us help you get a good grade on your paper. Get professional help and free up your time for more important courses. Let us handle your;

  • Dissertations and Thesis
  • Essays
  • All Assignments

  • Research papers
  • Terms Papers
  • Online Classes
Live ChatWhatsApp